First DERMS Green Quadrant: What We Learned From Comparing 10 Leading Providers

Digital Grid Technologies
Blog
03 Dec, 2025

The inaugural Verdantix Green Quadrant on grid DERMS is out. As batteries, PV and EVs scale, utilities need tools that keep feeders within limits, clear interconnection backlogs and run demand response (DR) and virtual power plant (VPP) programmes safely. We benchmarked 10 providers – Emerson’s Aspen Technology, emsys, GE Vernova, Generac Grid Services, Minsait ACS, mPrest, OATI, Oracle, Schneider Electric and Smarter Grid Solutions – using structured questionnaires, live briefings, customer input and desk research. Here are the main findings:

  • DERMS adoption today is modular, converging towards a single orchestrator.
    Utilities are not switching on everything at once; instead, they are beginning with lower-risk wins such as visibility, forecasting and interconnection enablement. They then add constraint-aware dispatch and programme operations as confidence grows, building towards a unified orchestration layer that coexists with advanced distribution management systems (ADMS) and supervisory control and data acquisition (SCADA) systems. The pressure is real: US interconnection queues have reached 2.3TW of generation and storage seeking grid access.
  • Capabilities are uneven – and utilities are cautious with AI in control.
    Across the leading DERMS vendors, forecasting, proxy estimation and programme tooling are the most consistently production-ready pieces. Objective-adaptive optimization, real-time grid-services support and deeper voltage coordination appear in pockets but are not yet universal at enterprise scale. Day-to-day actions still run primarily against engineered objectives and thresholds, reflecting a pragmatic stance from buyers who favour AI first for forecasting and usability, and only for closed-loop control once evidence and governance mature.
  • Evidence and integration quality are the new differentiators.
    Procurement teams are increasingly asking for the same proofs: references with meaningful MW/device counts, end-to-end latency and service-level agreement (SLA) data across IT/OT paths, audit-ready change control and security attestations, plus clean integrations via open standards and APIs to utility systems and multi-vendor devices. Regional context – grid topology, regulation and partner ecosystems – often decides who can deliver quickly, with vendors that show repeatable integrations and clear role boundaries advancing fastest through evaluation.
  • Two viable vendor paths are emerging.
    Grid-suite approaches from ADMS-heritage stacks tend to lead on network-model fidelity and platform cohesion, whereas specialist or grid-edge providers stand out for programme agility, enrolment/settlement and hosted scale. Utilities are explicitly choosing between a standalone DERMS that plugs into existing systems and a fuller grid suite that comes tightly aligned to the network model; the trade-off turns on integration effort, time to value and the skills available in-house.

The practical takeaway for decision-makers is to buy for today’s proven needs – feeder safety, interconnections and programme operations – while insisting on a roadmap to unify modules into a single, standards-based orchestration layer that fits existing operations. Firms should set evidence bars up front (scale, latency, security and governance), prioritize clean integrations, and grow automation as trust and data maturity build.

To keep up with the latest developments in the DERMS market and review the full benchmark – scores, justifications and vendor profiles – read the Verdantix Green Quadrant: DERMS 2025 report.

 